// SENIOR OVERLAY & INFRASTRUCTURE MANAGER

I help bring the world's biggest events to life.

Project Engineer with 10+ years of experience bringing major global events to life, working behind the scenes to deliver the infrastructure and environments where the world comes together. A positive thinker with a strong can-do attitude, I adapt quickly, build strong relationships, and enjoy working with diverse teams in demanding environments.

0+years on site
0global events
0continents
0languages

// 01 — FIELD MAP

Where the work has taken me

Nine sites, four continents. Every marker is a venue delivered.

World map of project locations A world map with glowing markers at Toronto, Santiago, Portsmouth, Paris, Livigno, Doha, Jakarta, Osaka and the Gold Coast.

// 02 — SELECTED WORK

Projects

Olympic rings above the Livigno Snow Park venue, Winter Olympics 2026
46.5385°N 10.1355°E2025–26

Winter Olympic Games — Livigno Snow Park

Senior Overlay Manager · Nussli — General Contractor

Full-scope overlay delivery across five competition sites, including the world's tallest Big Air ramp at 55 m. Directed all temporary infrastructure — athlete facilities, broadcast compounds, spectator access — across complex high-altitude terrain, managing hundreds of staff and subcontractors as primary interface with the IOC.

  • 5 competition sites
  • 55 m Big Air ramp
  • 100s of staff directed
Toronto Stadium with temporary stands for the FIFA World Cup 2026
43.6332°N 79.4186°W2026

FIFA World Cup 2026 — Toronto Stadium

Project Manager · Arena Group

Operations and maintenance of temporary overlay for a World Cup stadium venue. As Derig Supervisor, led dismantling and demobilization of 17,000+ temporary seats, VIP lounges and stadium extensions — planning derig sequences, workforce allocation and contractor interfaces through to venue handover.

  • 17,000+ seats
  • VIP & stadium extensions
  • Full site restoration
Inside the Paris 2024 Olympic aquatics venue with the delivery team
48.8566°N 2.3522°E2024

Paris 2024 Olympic Games

Senior Overlay Manager · Arena Group

Full accountability for overlay delivery of a flagship Olympic venue: 4,000 m² of tensile structures, 137 modular cabins, 8.1 km of perimeter fencing, 1,676 m² of trackway. Interface lead with the Olympic Committee, driving alignment across technical, operational and scheduling priorities — delivered on budget, on time.

  • 4,000 m² tensile structures
  • 8.1 km fencing
  • 137 modular cabins
FIFA World Cup Qatar 2022 final ceremony on the pitch
25.2854°N 51.5310°E2022–23

FIFA World Cup Qatar 2022

Cluster Overlay Manager · Supreme Committee / Mosanada

Led design, installation and commissioning of overlay infrastructure for 12 official training venues — temporary structures, HVAC, LV power distribution, trackway systems. Delivered every site within schedule and budget while absorbing late design changes and heavy logistical constraints.

  • 12 training venues
  • Full FIFA compliance
  • On schedule & budget
SailGP race boat being prepared at the Portsmouth technical site
50.7989°N 1.0912°W2025

SailGP — Portsmouth Edition

Venue Manager · LS Events

Full-scope overlay installation for the technical and paddock sites of the SailGP race. Managed site operations, contractor coordination and installation sequencing — delivered safe, on time, through tight stakeholder coordination.

  • Technical + paddock sites
  • General contractor scope
Packed arena during the Pan American Games 2023 in Santiago
33.4489°S 70.6693°W2023

Pan American Games — Santiago

Overlay Manager · GL Events

On-site execution of overlay works across four venues for the Pan American and Para-Pan American Games — coordinating contractors, validating technical documentation and managing dynamic scope changes with fast site decision-making.

  • 4 venues
  • Pan Am + Para Pan Am
The Serbian Pavilion at Osaka Expo 2025 with its green facade
34.6937°N 135.5023°E2024

Osaka Expo 2025 — Serbian Pavilion

Project Lead · GL Events (remote, São Paulo)

Coordinated client, architects and structural engineers for the Serbian Pavilion — technical documentation, structural design packages, material specification, procurement with local suppliers, operational planning and cost estimates.

  • International interface
  • Design → procurement
Aerial view of an Asian Games 2018 venue in Jakarta with temporary overlay structures
6.2088°S 106.8456°E2018

Asian Games — Jakarta

Cluster Site Manager, Overlay · GL Events

Managed overlay infrastructure delivery across four competition venues as cluster site manager. Coordinated parallel installation programmes on sites running to different schedules, sequencing crews and equipment between them to keep every venue moving toward a shared deadline. Oversaw temporary structures, spectator facilities and site services, working with local subcontractors in a dense urban environment and tropical conditions.

  • 4 venues
  • Multi-site coordination
  • Jakarta, Indonesia
Carrara Stadium during the Gold Coast 2018 Commonwealth Games
28.0167°S 153.4000°E2018

Commonwealth Games — Gold Coast

Grandstand Site Manager · GL Events

Led the delivery of 12,000 temporary grandstand seats for the Games. Managed the full installation cycle on site — from foundation setting-out and deck build-up through to seating, stairs, handrails and access routes — directing installation crews and sequencing the build to hold the programme. Ensured every structure met certification and spectator safety requirements ahead of venue handover, then oversaw safe dismantling once competition closed.

  • 12,000 seats
  • Structural certification
  • Gold Coast, Australia

// 03 — CAREER SCHEDULE

Fifteen years of experience, one event at a time.

Every project manager lives in a Gantt chart. Here's mine.

201120142017202020232026
Colas — Civil Site Manager
2011–14 · France
Eiffage — Civil Site Engineer
2014–17 · France
GL Events — Commonwealth Games
2018 · Gold Coast
GL Events — Asian Games
2018 · Jakarta
Freelance — Project Engineer
2019–22
Mosanada — FIFA WC Qatar
2022–23 · Doha
GL Events — Pan Am + Expo
2023–24
Arena — Paris 2024 Olympics
2024 · Paris
LS Events — SailGP
2025
Nussli — Winter Olympics 2026
2025–26 · Livigno
Arena — FIFA WC 2026
2026 · Toronto

// 04 — ABOUT

From concrete to grandstands

I'm Lucas. I'm a civil engineer by trade, but somewhere along the way, I found myself drawn to a rather unusual corner of construction: building things that are designed to leave no traces.

It started with roads and civil works in France, working with Colas and Eiffage. Then, in 2018, a temporary seating project for the Commonwealth Games took me somewhere I hadn't expected to go. I haven't really looked back since.

Over the years, I've had the chance to help build the temporary infrastructures that make major global events possible. From training venues in the Qatari desert to a flagship Olympic venue in Paris, and even the tallest Big Air ramp ever built, perched 1,800 metres above sea level in the Italian Alps.

What keeps me coming back is the challenge. Deadlines that don't move. Sites that rarely go according to plan. Scope changes that appear overnight. And, at the end of it all, an opening ceremony that starts exactly on time, whether you're ready or not.

It's a strange mix of engineering precision, problem-solving, teamwork, and a healthy dose of adrenaline. And somewhere between the concrete and the events, I found exactly where I wanted to be.

FR FrançaisEN EnglishPT PortuguêsES Español

// FEATURED EVENTS

FIFA World Cup 26™ · Toronto Olympic Winter Games · Milano Cortina 2026 Olympic Games · Paris 2024 FIFA World Cup Qatar 2022™ Pan American Games · Santiago 2023 SailGP · Portsmouth World Expo · Osaka 2025 Asian Games · Jakarta 2018 Commonwealth Games · Gold Coast 2018
Lucas Frestel — portrait with the events of his career

// EDUCATION

Master in Civil Engineering
EI.CESI Engineering Institute, 2012–2017

// TOOLKIT

Project managementVenue managementRisk managementProcurementMS ProjectAutoCADArchiCADAdobe Suite

// 05 — SERVICES

What I deliver

S.01

Overlay management

Full-scope temporary infrastructure: planning, design, installation and commissioning — from tensile structures to power distribution.

S.02

Venue & site management

Site logistics, operations, installation sequencing and contractor coordination on live, high-pressure event sites.

S.03

Project leadership

End-to-end delivery from pre-construction through handover — schedule, budget and quality under full control.

S.04

Technical interface

Liaison between organizing committees (IOC, FIFA), engineers and contractors — design validation, constructability, compliance.

S.05

Risk & procurement

Proactive problem-solving, procurement coordination, and absorbing late scope changes without touching critical deadlines.

Organizing committee, general contractor or federation with a venue to deliver?

Discuss your project →

// 06 — CONTACT

Let's build something
together.

Available for overlay and infrastructure projects worldwide.

Opens in your email client. Prefer direct? Just write to the address on the left.